New building OPZC Rekem

[text] =>

De Kock BV realized the complete HVAC installation that provides the entire building with heating and sanitary hot water through a main boiler room and 2 substations where 5 decentralized boilers and 3 condensing gas boilers were placed.
In addition, 9 ventilation groups were installed. Three of these groups are equipped with a heating and cooling battery to separately supply the special isolation rooms with the required temperature and ventilation.
Optimal operation of the entire plant is maintained through automatic control.

[shortcode plugin=lightbox id="OPZC_Rekem"]
[parent] => 12 [author] => ilsehuybrechts [date] => 1634644580 [online] => on [commentaire] => off [image] => CMS/content/images/202110/1920x1284-opzc-rekem.jpg [update_auteur] => ilsehuybrechts [update_date] => 1634644826 [keywords] => de-kock [orderID] => 14 [customFields] => Array ( [techniques] => heating;ventilation ) [permalink] => opzc-rekem [homepage] => off [display] => page_type.php [SEO_description] => [SEO_title] => [alt] => [type] => HD [resolution] => 1920x1284 [imageFile] => content/images/202110/1920x1284-opzc-rekem.jpg [URL] => en/opzc-rekem/ )
preloader

OPZC Rekem

New building OPZC Rekem
OPZC Rekem

De Kock BV realized the complete HVAC installation that provides the entire building with heating and sanitary hot water through a main boiler room and 2 substations where 5 decentralized boilers and 3 condensing gas boilers were placed.
In addition, 9 ventilation groups were installed. Three of these groups are equipped with a heating and cooling battery to separately supply the special isolation rooms with the required temperature and ventilation.
Optimal operation of the entire plant is maintained through automatic control.