preloader
This website uses cookies. The essential and functional cookies are necessary for the proper functioning of the website and cannot be refused. Other cookies are used for statistical purposes (analytical cookies) and are only placed after you have made a choice. Read more about it in our Cookie Policy. cookie at the bottom right of our website.
Accept
Configuration
Decline
cookie
Cookies configureren / Configurez les cookies / Cookies configuration

(NL) Functionele cookies zijn essentieel voor de werking van de website en kunnen niet worden gedeactiveerd. Om uw ervaring te verbeteren, worden andere cookies gebruikt. U kunt ervoor kiezen om ze uit te schakelen. Ze kunnen op elk moment worden gewijzigd via dit venster.

(FR) Les cookies fonctionnels sont essentiels pour le fonctionnement du site internet et ne peuvent être désactivés. Pour améliorer votre expérience, d'autres cookies sont utilisés. Vous pouvez choisir de les désactiver. Ils restent modifiables à tout moment via cette fenêtre.

(EN) Functional cookies are essential for the operation of the website and cannot be deactivated. To improve your experience, other cookies are used. You can choose to turn them off. They can be modified at any time via this window.

Functionele cookies / Cookies fonctionnels / Functional cookies
Analytics- en marketingcookies / Cookies d'analyse et de marketing / Analysis and marketing cookies
Opnemen / Sauvegarder / Save

Dematra Kruisem

Dematra from Nazareth built a fully automated high-rise warehouse 46 meters tall with 80,000 pallet positions and a capacity of 12,000 pallets per day, an international first with an ecologically advantageous footprint due to its compact space of 10,000 square meters, despite complex challenges such as high-placed ducts and air conditioning with 10 air handling units.
Dematra Kruisem

A fully automated high-rise warehouse for storage and distribution company Dematra from Nazareth. The warehouse stands 46 meters tall and can accommodate 80,000 pallets. It can move 12,000 pallets within 24 hours, marking an international first.

Due to its height, the warehouse occupies only 10,000 square meters. Without building vertically, it would require 5 to 6 hectares of space, significantly reducing its ecological footprint.

Several challenges made this project complex, including:

- Installing ducts and ring mains at heights reaching up to 42 meters.
- Placing ducts within Stow racks, with just 1 hour allocated for assembly.
- Air conditioning the high-rise structure; the warehouse can cool products to 13°C using 10 air handling units capable of delivering 20,000 cubic meters of air per hour.
This multi-T project is executed by Beltherm and EEG Sint-Martens-Latem branches, subcontracted by Alheembouw.

Works performed include:

- Supplying and installing ventilation ducts and air handling units.
- Cooling and heating for the high-rise and picking zone, along with complete automation and monitoring using highly innovative techniques.
- Using 80 fan coil units and 11 air handling units, in conjunction with approximately 1MW reversible heat pumps, ensuring constant indoor climate control.